Watab is also the least agricultural Township in
Due to the location of U.S. Highway 10 in Watab,
commercial and industrial development comprises a larger share of its land area
than other townships. Comprising 464.4 acres or 3.4 percent of Watab's land
area, commercial and industrial development is focused on providing goods and
services to the surrounding area as well as to the traveling public. As the
Watab area grows, commercial development will continue to be located along this
regional highway.
Existing Zoning
As a result of the
increasing amount of urban development found along Highway 10 and
Watab faces considerable
challenges in the near future. Due to the increasing amount of urban
development in
Due to this increasing
growth, the Benton County Comprehensive plan of 1999 has termed a large portion
of Watab as "urban transition". What does urban transition mean"
According to the
Permits
Road Services
The townships maintain township
roads. The county roads are maintained by the county. You need to know which
you live on. Snowplowing and ditch mowing in
Emergency Services
Approximately the north third of the township receives
emergency services from the Rice Fire Department. The City of
Township Officers
Lloyd
Erdmann Chairperson Craig Gondeck Brad
Mcintosh
320-393-4279 320-393-3120 320-255-1521
lloyderdmann@cloudnet.com
Treasurer: Clerk:
Eileen Saldana Pat Spence 320-255-8916
Self Assessment Process:
BMP
Summary Sheet Instructions
Minimum
Control Measure 1: PUBLIC EDUCATION
AND OUTREACH
|
Key to
Unique BMP ID Numbers |
Required
BMP Title |
Permit
Reference |
|
1a-1 |
Distribute Educational
Materials |
V.G.1.a |
|
1b-1 |
Implement an Education
Program |
V.G.1.b |
|
1c-1 |
Education Program: Public
Education and Outreach |
V.G.1.c |
|
1c-2 |
Education Program: Public
Participation |
V.G.1.c |
|
1c-3 |
Education Program: Illicit
Discharge Detection and Elimination |
V.G.1.c |
|
1c-4 |
Education Program:
Construction Site Run-off Control |
V.G.1.c |
|
1c-5 |
Education Program:
Post-Construction Stormwater Management in New Development and Redevelopment |
V.G.1.c |
|
1c-6 |
Education Program:
Pollution Prevention/Good Housekeeping for Municipal Operations |
V.G.1.c |
|
1d-1 |
Coordination of Education
Program |
V.G.1.d |
|
1e-1 |
Annual Public Meeting |
V.G.1.e |
|
|
Additional BMP Summary
Sheet (Copy as Necessary) |
|
Minimum
Control Measure 2: PUBLIC
PARTICIPATION/INVOLVEMENT
|
Key to
Unique BMP ID Numbers |
Required
BMP Title |
Permit
Reference |
|
2a-1 |
Comply with Public Notice
Requirements |
V.G.2.a |
|
2b-1 |
Solicit Public Input and
opinion on the Adequacy of the SWPPP |
V.G.2.b |
|
2c-1 |
Consider Public Input |
V.G.2.c |
|
|
Additional BMP Summary
Sheet (Copy as Necessary) |
|
Minimum
Control Measure 3: ILLICIT DISCHARGE
DETECTION AND ELIMINATION
|
Key to
Unique BMP ID Numbers |
Required
BMP Title |
Permit
Reference |
|
3a-1 |
Storm Sewer System Map |
V.G.3.a |
|
3b-1 |
Regulatory Control Program |
V.G.3.b |
|
3c-1 |
Illicit Discharge Detection
and Elimination Plan |
V.G.3.c |
|
3d-1 |
Public and Employee Illicit
Discharge Information Program |
V.G.3.d |
|
3e-1 |
Identification of Non
Stormwater Discharges and Flows |
V.G.3.e |
|
|
Additional BMP Summary
Sheet (Copy as Necessary) |
|
Minimum
Control Measure 4: CONSTRUCTION SITE
STORMWATER RUNOFF CONTROL
|
Key to
Unique BMP ID Numbers |
Required
BMP Title |
Permit
Reference |
|
4a-1 |
Ordinance or other
Regulatory Mechanism |
V.G.4.a |
|
4b-1 |
Construction Site Implementation
of Erosion and Sediment Control BMPs |
V.G.4.b |
|
4c-1 |
Waste Controls for
Construction Site Operators |
V.G.4.c |
|
4d-1 |
Procedure for Site Plan
Review |
V.G.4.d |
|
4e-1 |
Establishment of Procedures
for the Receipt and Consideration of Reports of Stormwater Noncompliance |
V.G.4.e |
|
4f-1 |
Establishment of Procedures
for Site Inspections and Enforcement |
V.G.4.f |
|
|
Additional BMP Summary
Sheet (Copy as Necessary) |
|
Minimum Control Measure 5: POST-CONSTRUCTION STORMWATER MANAGEMENT IN NEW
DEVELOPMENT AND REDEVELOPMENT
|
Key to
Unique BMP ID Numbers |
Required
BMP Title |
Permit
Reference |
|
5a-1 |
Development and
Implementation of Structural and/or Non-structural BMPs |
V.G.5.a |
|
5b-1 |
Regulatory Mechanism to
Address Post Construction Runoff from New Development and Redevelopment |
V.G.5.b |
|
5c-1 |
Long-term Operation and
Maintenance of BMPs |
V.G.5.c |
|
|
Additional BMP Summary
Sheet (Copy as Necessary) |
|
Minimum
Control Measure 6: POLLUTION
PREVENTION/GOOD HOUSEKEEPING
|
Key to
Unique BMP ID Numbers |
Required
BMP Title |
Permit
Reference |
|
6a-1 |
Municipal Operations and
Maintenance Program |
V.G.6.a |
|
6a-2 |
Street Sweeping** |
|
|
6b-2 |
Annual Inspection of All
Structural Pollution Control Devices |
V.G.6.b.2 |
|
6b-3 |
Inspection of a Minimum of
20 percent of the MS4 Outfalls, |
V.G.6.b.3 |
|
6b-4 |
Annual Inspection of All
Exposed Stockpile, Storage and Material Handling Areas |
V.G.6.b.4 |
|
6b-5 |
Inspection Follow-up
Including the Determination of Whether
Repair, Replacement, or Maintenance Measures are Necessary and the
Implementation of the Corrective Measures |
V.G.6.b.5 |
|
6b-6 |
Record Reporting and
Retention of all Inspections and Responses to the Inspections |
V.G.6.b.6 |
|
6b-7 |
Evaluation of Inspection
Frequency |
V.G.6.b.7 |
|
|
Additional BMP Summary
Sheet (Copy as Necessary) |
|
|
Key to
Unique BMP ID Numbers |
Required
BMP Title |
Permit
Reference |
|
7a-1 |
Impaired Waters Review
Process |
IV.D Section 303(d) listings |
BMP Summary Sheet |
||
|
MS4 Name: |
|
|
|
Minimum Control Measure: |
1-PUBLIC EDUCATION AND
OUTREACH |
|
|
Unique BMP Identification Number: |
1a-1 |
|
|
*BMP Title: |
Distribute Educational
Materials |
|
|
*BMP Description: |
||
|
Put together flier and send
to each household in township via US Mail. The flier will educate the
public on the history of the clean water act and stormwater rule making. Township will include information
on its website regarding its stormwater management program. It will also include tips for erosion
prevention and sediment control techniques on the website. The information will be provided as general
guidelines for managing sites. Much of
the information will be supported by pictorials. The webpage will contain links to area professionals
and agencies that provide services in the stormwater management industry. |
||
|
Location(s) in SWPPP of
detailed information relating to this BMP: |
||
|
*Measurable Goals: |
||
|
Develop links to area stormwater
professionals' websites Designate responsible party
and designate space in township flier for stormwater management activity
information. Development additional
programs to address specific issues in regard to stormwater management within
the township |
||
|
*Timeline/Implementation Schedule: |
||
|
2007 provide links to area stormwater
management professionals' websites 2007 Maintain up-to-date
Township website with informational website links to PCA, Red Barn Ridge,
MECA and more. 2008 designate responsible
party and designate space in township flier for stormwater management
activity information. |
||
|
Specific Components and Notes: |
||
|
|
||
|
*Responsible Party for this BMP: |
||
|
Name: |
Maureen Graber,
Representative of the |
|
|
Department: |
|
|
|
Phone: |
320-282-7113 Maureen Graber
Cell |
|
|
E-mail: |
|
|
|
Indicates a REQUIRED field. Failure to complete any
required field will result in rejection of the application due to
incompleteness. |
||
BMP Summary Sheet |
|||
|
MS4 Name: |
|
||
|
Minimum Control Measure: |
PUBLIC EDUCATION AND
OUTREACH |
||
|
Unique BMP Identification Number: |
1b-1 |
||
|
*BMP Title: |
Implement an Education
Program |
||
|
*BMP Description: |
|||
|
Township will rely heavily
on its website to educate resident because Watab township is a rural setting
with no schools and few appropriate commercial sites. Area schools in neighboring MS4s have
implemented education programs to address public outreach and education in
their SWPPPs. Create Township website
with informational website links to PCA, Red Barn Ridge, MECA and more. |
|||
|
Location(s) in SWPPP of
detailed information relating to this BMP: |
|||
|
|
|||
|
*Measurable Goals: |
|||
|
Follow up with neighboring
MS4 to verify activities. Annual review of Township
website |
|||
|
*Timeline/Implementation Schedule: |
|||
|
2007 Maintain up-to-date
Township website with informational website links to PCA, Red Barn Ridge,
MECA and more. 2009 Create verification
report |
|||
|
Specific Components and Notes: |
|||
|
|
|||
|
*Responsible Party for this BMP: |
|||
|
Name: |
Maureen Graber,
Representative of the |
||
|
Department: |
|
||
|
Phone: |
320-282-7113 Maureen Graber
Cell |
||
|
E-mail: |
|
||
|
*Indicates a REQUIRED field. Failure to complete any
required field will result in rejection of the application due to
incompleteness. |
|||
BMP Summary Sheet |
|||
|
MS4 Name: |
|
||
|
Minimum Control Measure: |
PUBLIC EDUCATION AND
OUTREACH |
||
|
Unique BMP Identification Number: |
1c-1 |
||
|
*BMP Title: |
Education Program: Public
Education and Outreach |
||
|
*Audience(s) Involved: |
|||
|
All township residents,
business owners, town board, developers, contractors, etc |
|||
|
*Educational Goals for Each Audience: |
|||
|
Increase awareness. Create
a positive attitude and commitment to improving the community. |
|||
|
*Activities Used to Reach Educational Goals: |
|||
|
1.) Stake holders meeting
as they are requested and organized 2.) Distribution of
educational information fliers at town hall 3.) Maintain up-to-date 4.) Promote seminars and
other programs 5.) Report at annual
meeting |
|||
|
*Activity Implementation Plan: |
|||
|
2007 website update 2008 fliers at town hall 2008 Community meeting and
focus groups |
|||
|
*Performance Measures: |
|||
|
Track number of complaints Track attendance at meetings Track use of information
channels Annual review of website |
|||
|
*Responsible Party for this BMP: |
|||
|
Name: |
Maureen Graber,
Representative of the |
||
|
Department: |
|
||
|
Phone: |
320-282-7113 Maureen Graber
Cell |
||
|
E-mail: |
|
||
|
*Indicates a REQUIRED field. Failure to complete any
required field will result in rejection of the application due to
incompleteness. |
|||
BMP Summary Sheet |
|||
|
MS4 Name: |
|
||
|
Minimum Control Measure: |
PUBLIC EDUCATION AND
OUTREACH |
||
|
Unique BMP Identification Number: |
1c-2 |
||
|
*BMP Title: |
Education Program: Public
Participation |
||
|
*Audience(s) Involved: |
|||
|
All township residents,
business owners, town board, developers, contractors, etc |
|||
|
*Educational Goals for Each Audience: |
|||
|
Educate the public on the
importance, impact, and interrelatedness to water quality issues and how the
activities of humans can impact the environment as a whole. Teach the public what are acceptable
activities. Teach the public how to
identify and react to illicit discharges and hazardous spills |
|||
|
*Activities Used to Reach Educational Goals: |
|||
|
Township website Informational website links
to PCA, Red Barn Ridge, MECA and more. Seminars, and fliers |
|||
|
*Activity Implementation Plan: |
|||
|
2007 website update 2008 fliers at town hall 2008 Community meeting and
focus groups |
|||
|
*Performance Measures: |
|||
|
Track number of complaints Track attendance at meeting Track use of information
channels |
|||
|
*Responsible Party for this BMP: |
|||
|
Name: |
Maureen Graber,
Representative of the |
||
|
Department: |
|
||
|
Phone: |
320-282-7113 Maureen Graber
Cell |
||
|
E-mail: |
|
||
|
*Indicates a REQUIRED field. Failure to complete any
required field will result in rejection of the application due to
incompleteness. |
|||
BMP Summary Sheet |
|||
|
MS4 Name: |
|
||
|
Minimum Control Measure: |
PUBLIC EDUCATION AND
OUTREACH |
||
|
Unique BMP Identification Number: |
1c-3 |
||
|
*BMP Title: |
Education Program: Illicit
Discharge Detection and Elimination |
||
|
*Audience(s) Involved: |
|||
|
General public - township
residents |
|||
|
*Educational Goals for Each Audience: |
|||
|
Create an understanding of
what an illicit discharge is, how it affects the environment, what to do
about it, and how to prevent it. |
|||
|
*Activities Used to Reach Educational Goals: |
|||
|
Township website Informational website links
to PCA, Red Barn Ridge, MECA and more. Seminars, and fliers |
|||
|
*Activity Implementation Plan: |
|||
|
2007 website update 2008 fliers at town hall 2008 Community meeting and
focus groups |
|||
|
*Performance Measures: |
|||
|
Track number of complaints Track attendance at meeting Track use of information
channels Annual review of website |
|||
|
*Responsible Party for this BMP: |
|||
|
Name: |
Maureen Graber,
Representative of the |
||
|
Department: |
|
||
|
Phone: |
320-282-7113 Maureen Graber
Cell |
||
|
E-mail: |
|
||
|
*Indicates a REQUIRED field. Failure to complete any
required field will result in rejection of the application due to
incompleteness. |
|||
BMP Summary Sheet |
|||
|
MS4 Name: |
|
||
|
Minimum Control Measure: |
PUBLIC EDUCATION AND
OUTREACH |
||
|
Unique BMP Identification Number: |
1c-4 |
||
|
*BMP Title: |
Education Program:
Construction Site Run-off Control |
||
|
*Audience(s) Involved: |
|||
|
Excavators, Building trades
sub-contractors, engineers, inspectors, and general public |
|||
|
*Educational Goals for Each Audience: |
|||
|
Teach them the regulations. Teach them the BMP options. Teach them how to react to
differing situations Teach them to whom and how
to report problems. |
|||
|
*Activities Used to Reach Educational Goals: |
|||
|
Website - Maintain up-to-date
Township website with informational website links to PCA, Red Barn Ridge,
MECA and more. Seminars, and fliers |
|||
|
*Activity Implementation Plan: |
|||
|
2007 2007 Fliers at town hall 2008 Erosion and sediment
control seminars 2008 Community meeting and
focus groups |
|||
|
*Performance Measures: |
|||
|
Track number of inspection
reported violations Track number of complaints Track attendance at meeting Track use of information
channels Annual review of website |
|||
|
*Responsible Party for this BMP: |
|||
|
Name: |
Maureen Graber,
Representative of the |
||
|
Department: |
|
||
|
Phone: |
320-282-7113 Maureen Graber
Cell |
||
|
E-mail: |
|
||
|
*Indicates a REQUIRED field. Failure to complete any
required field will result in rejection of the application due to
incompleteness. |
|||
BMP Summary Sheet |
|||
|
MS4 Name: |
|
||
|
Minimum Control Measure: |
PUBLIC EDUCATION AND
OUTREACH |
||
|
Unique BMP Identification Number: |
1c-5 |
||
|
*BMP Title: |
Education Program:
Post-Construction Stormwater Management in New Development and Redevelopment |
||
|
*Audience(s) Involved: |
|||
|
Home owners and general
public |
|||
|
*Educational Goals for Each Audience: |
|||
|
Teach they what is acceptable
activity regarding stormwater management Teach them how to perform
inspection of stormwater structures and devices in their community i.e.
Annual pond maintenance inspections |
|||
|
*Activities Used to Reach Educational Goals: |
|||
|
Erosion and sediment control
seminars Township website Informational website links
to PCA, Red Barn Ridge, MECA and more. Fliers Community meeting and focus
groups |
|||
|
*Activity Implementation Plan: |
|||
|
2007 Erosion and sediment
control seminars 2007 website update, fliers
at town hall 2008 Community meeting and
focus groups |
|||
|
*Performance Measures: |
|||
|
Track number of inspection
reported violations Track number of complaints Track meeting requests Review annual inspection
reports |
|||
|
*Responsible Party for this BMP: |
|||
|
Name: |
Maureen Graber, Representative
of the |
||
|
Department: |
|
||
|
Phone: |
320-282-7113 Maureen Graber
Cell |
||
|
E-mail: |
|
||
|
*Indicates a REQUIRED field. Failure to complete any
required field will result in rejection of the application due to
incompleteness. |
|||
BMP Summary Sheet |
|||
|
MS4 Name: |
|
||
|
Minimum Control Measure: |
PUBLIC EDUCATION AND
OUTREACH |
||
|
Unique BMP Identification Number: |
1c-6 |
||
|
*BMP Title: |
Education Program:
Pollution Prevention/Good Housekeeping for Municipal Operations |
||
|
*Audience(s) Involved: |
|||
|
Municipal worker, Administrators, and hired contractors |
|||
|
*Educational Goals for Each Audience: |
|||
|
To make know the impact,
good and bad, their activities can have on the storm water issues and
environmental health or the community. To help create a township
wide awareness or example via public works projects or activities. Foster a sense of civic
pride |
|||
|
*Activities Used to Reach Educational Goals: |
|||
|
Erosion and sediment
control Provide education for waste
handling Township programs promoting
Recycling, Used motor oil disposal, Township programs promoting
old tire disposal Township activities
encouraging Hazardous waste identification and disposal |
|||
|
*Activity Implementation Plan: |
|||
|
Expand existing programs Annually |
|||
|
*Performance Measures: |
|||
|
Track public response or
participation |
|||
|
*Responsible Party for this BMP: |
|||
|
Name: |
Maureen Graber,
Representative of the |
||
|
Department: |
|
||
|
Phone: |
320-282-7113 Maureen Graber
Cell |
||
|
E-mail: |
|
||
|
*Indicates a REQUIRED field. Failure to complete any
required field will result in rejection of the application due to
incompleteness. |
|||
BMP Summary Sheet |
|||
|
MS4 Name: |
|
||
|
Minimum Control Measure: |
PUBLIC EDUCATION AND
OUTREACH |
||
|
Unique BMP Identification Number: |
1d-1 |
||
|
*BMP Title: |
Coordination of Education
Program |
||
|
*BMP Description: |
|||
|
Co-op with neighboring
communities, state agencies, |
|||
|
Location(s) in SWPPP of
detailed information relating to this BMP: |
|||
|
|
|||
|
*Measurable Goals: |
|||
|
Provide information about
web links/access to educational material available from MPCA, |
|||
|
*Timeline/Implementation Schedule: |
|||
|
2007 Maintain up-to-date
Township website with informational website links to PCA, Red Barn Ridge,
MECA and more. Update links annually or as
needed. |
|||
|
Specific Components and Notes: |
|||
|
|
|||
|
*Responsible Party for this BMP: |
|||
|
Name: |
Maureen Graber,
Representative of the |
||
|
Department: |
|
||
|
Phone: |
320-282-7113 Maureen Graber
Cell |
||
|
E-mail: |
|
||
|
*Indicates a REQUIRED field. Failure to complete any
required field will result in rejection of the application due to
incompleteness. |
|||
BMP Summary Sheet |
|||
|
MS4 Name: |
|
||
|
Minimum Control Measure: |
PUBLIC EDUCATION AND
OUTREACH |
||
|
Unique BMP Identification Number: |
1e-1 |
||
|
*BMP Title: |
Annual Public Meeting |
||
|
*BMP Description: |
|||
|
The township will conduct
an annual meeting to review stormwater and water quality issue. The township MS4 SWPPP in general will be
reviewed at this time also. |
|||
|
Location(s) in SWPPP of
detailed information relating to this BMP: |
|||
|
|
|||
|
*Measurable Goals: |
|||
|
Place on agenda for Review adherence to
township SWPPP |
|||
|
*Timeline/Implementation Schedule: |
|||
|
2007 Annually |
|||
|
Specific Components and Notes: |
|||
|
Encourage stakeholders,
public officials and general public to participate Promote participation |
|||
|
*Responsible Party for this BMP: |
|||
|
Name: |
Maureen Graber,
Representative of the |
||
|
Department: |
|
||
|
Phone: |
320-282-7113 Maureen Graber
Cell |
||
|
E-mail: |
|
||
|
*Indicates a REQUIRED field. Failure to complete any
required field will result in rejection of the application due to
incompleteness. |
|||
BMP
Summary Sheet Instructions
Minimum
Control Measure 2: PUBLIC
PARTICIPATION/INVOLVEMENT
|
Key to
Unique BMP ID Numbers |
Required
BMP Title |
Permit
Reference |
|
2a-1 |
Comply with Public Notice
Requirements |
V.G.2.a |
|
2b-1 |
Solicit Public Input and
opinion on the Adequacy of the SWPPP |
V.G.2.b |
|
2c-1 |
Consider Public Input |
V.G.2.c |
BMP Summary Sheet |
|||
|
MS4 Name: |
|
||
|
Minimum Control Measure: |
2-PUBLIC PARTICIPATION/INVOLVEMENT |
||
|
Unique BMP Identification Number: |
2a-1 |
||
|
*BMP Title: |
Comply with Public Notice
Requirements |
||
|
*BMP Description: |
|||
|
The township will place
NPDES Phase II program on the agenda of the annual town Board meeting in
advance of the annual report. Or township will hold a
special meeting to review the year's progress. Meetings will be used to
solicit input from citizens. |
|||
|
Location(s) in SWPPP of
detailed information relating to this BMP: |
|||
|
|
|||
|
*Measurable Goals: |
|||
|
Meeting notice published in
advance, per state law Specify format and timing
of meeting to ensure full and fair consideration of all views. Post on township website |
|||
|
*Timeline/Implementation Schedule: |
|||
|
Notice posting prior to meeting
( using standard posting procedures and methods) 2007 update website |
|||
|
Specific Components and Notes: |
|||
|
|
|||
|
*Responsible Party for this BMP: |
|||
|
Name: |
Maureen Graber,
Representative of the |
||
|
Department: |
|
||
|
Phone: |
320-282-7113 Maureen Graber
Cell |
||
|
E-mail: |
|
||
|
*Indicates a REQUIRED field. Failure to complete any
required field will result in rejection of the application due to
incompleteness. |
|||
BMP Summary Sheet |
|||
|
MS4 Name: |
|
||
|
Minimum Control Measure: |
2-PUBLIC
PARTICIPATION/INVOLVEMENT |
||
|
Unique BMP Identification Number: |
2b-1 |
||
|
*BMP Title: |
Solicit Public Input and
opinion on the Adequacy of the SWPPP |
||
|
*BMP Description: |
|||
|
The township will make the
SWPPP and relates records available to the general public at reasonable times
during town hall business hours or post on website or both. The township will follow
applicable public notice requirements and solicit public opinion about the
adequacy of the SWPPP. The township
will consider both written and oral public comments. |
|||
|
Location(s) in SWPPP of
detailed information relating to this BMP: |
|||
|
|
|||
|
*Measurable Goals: |
|||
|
Provide an opportunity for
the public input in written or oral format. Track number of suggestions
and composition. Set participation goals |
|||
|
*Timeline/Implementation Schedule: |
|||
|
Annually |
|||
|
Specific Components and Notes: |
|||
|
|
|||
|
*Responsible Party for this BMP: |
|||
|
Name: |
Maureen Graber,
Representative of the |
||
|
Department: |
|
||
|
Phone: |
320-282-7113 Maureen Graber
Cell |
||
|
E-mail: |
|
||
|
*Indicates a REQUIRED field. Failure to complete any
required field will result in rejection of the application due to
incompleteness. |
|||
BMP Summary Sheet |
|||
|
MS4 Name: |
|
||
|
Minimum Control Measure: |
2-PUBLIC
PARTICIPATION/INVOLVEMENT |
||
|
Unique BMP Identification Number: |
2c-1 |
||
|
*BMP Title: |
Consider Public Input |
||
|
*BMP Description: |
|||
|
The township will place
NPDES Phase II MS4 program on the
agenda of the Town Board in advance of the annual report or hold a special
meeting to review year's progress and to solicit input from the public. The township will make the
SWPPP and relates records available to the general public at reasonable times
during town hall business hours or post on website or both. The township will follow
applicable public notice requirements and solicit public opinion about the
adequacy of the SWPPP. The township
will consider both written and oral public comments |
|||
|
Location(s) in SWPPP of
detailed information relating to this BMP: |
|||
|
|
|||
|
*Measurable Goals: |
|||
|
Provide an opportunity for
the public input in written or oral format. Review public comments for
appropriateness and feasibility. Summarize possible changes
in annual report. Track number of suggestions
and composition. |
|||
|
*Timeline/Implementation Schedule: |
|||
|
Annually |
|||
|
Specific Components and Notes: |
|||
|
|
|||
|
*Responsible Party for this BMP: |
|||
|
Name: |
Maureen Graber,
Representative of the |
||
|
Department: |
|
||
|
Phone: |
320-282-7113 Maureen Graber
Cell |
||
|
E-mail: |
|
||
|
*Indicates a REQUIRED field. Failure to complete any
required field will result in rejection of the application due to
incompleteness. |
|||
BMP
Summary Sheet Instructions
Minimum Control Measure 3: ILLICIT DISCHARGE DETECTION AND ELIMINATION
|
Key to
Unique BMP ID Numbers |
Required
BMP Title |
Permit
Reference |
|
3a-1 |
Storm Sewer System Map |
V.G.3.a |
|
3b-1 |
Regulatory Control Program |
V.G.3.b |
|
3c-1 |
Illicit Discharge Detection
and Elimination Plan |
V.G.3.c |
|
3d-1 |
Public and Employee Illicit
Discharge Information Program |
V.G.3.d |
|
3e-1 |
Identification of Non
Stormwater Discharges and Flows |
V.G.3.e |
BMP Summary Sheet |
|||
|
MS4 Name: |
|
||
|
Minimum Control Measure: |
3-ILLICIT DISCHARGE
DETECTION AND ELIMINATION |
||
|
Unique BMP Identification Number: |
3a-1 |
||
|
*BMP Title: |
Storm Sewer System Map |
||
|
*BMP Description: |
|||
|
A map showing the
township's natural drainage ways and the man made conveyances. The township has no storm
sewer system curb, gutter, & piping.
Special attention will be
paid to streams and ditches leading to |
|||
|
Location(s) in SWPPP of
detailed information relating to this BMP: |
|||
|
|
|||
|
*Measurable Goals: |
|||
|
Report mapping progress to
board semi-annually. |
|||
|
*Timeline/Implementation Schedule: |
|||
|
A map showing all systems
convening stormwater to the above mentioned water bodies after 1/2 inch of
rain will be mapped by march 2008. Each year the map will be
reviewed and updated as needed Note; In much of the
township rain of less than 1/2" typically infiltrate into the sandy
soils. |
|||
|
Specific Components and Notes: |
|||
|
|
|||
|
*Responsible Party for this BMP: |
|||
|
Name: |
Maureen Graber,
Representative of the |
||
|
Department: |
|
||
|
Phone: |
320-282-7113 Maureen Graber
Cell |
||
|
E-mail: |
|
||
|
*Indicates a REQUIRED field. Failure to complete any
required field will result in rejection of the application due to
incompleteness. |
|||
BMP Summary Sheet |
|||
|
MS4 Name: |
|
||
|
Minimum Control Measure: |
3-ILLICIT DISCHARGE DETECTION
AND ELIMINATION |
||
|
Unique BMP Identification Number: |
3b-1 |
||
|
*BMP Title: |
Regulatory Control Program |
||
|
*BMP Description: |
|||
|
· Debris or other materials such as grass clippings, vegetative materials, tree branches, earth fill, rocks, concrete chunks, metal, other demolition or construction materials, or structures. · The disposal or misuse of chemicals or any other materials that would degrade the quality of waters within the system, including, but not limited to chemicals (fertilizers, herbicides, pesticides, etc) or petroleum based products (gasoline, oil, fuels, solvents, paint, etc.) |
|||
|
Location(s) in SWPPP of
detailed information relating to this BMP: |
|||
|
|
|||
|
*Measurable Goals: |
|||
|
Create an ordinance by
2008. Review ordinance semi
annually and update as needed |
|||
|
*Timeline/Implementation Schedule: |
|||
|
Fully implemented by 2009 |
|||
|
Specific Components and Notes: |
|||
|
|
|||
|
*Responsible Party for this BMP: |
|||
|
Name: |
Maureen Graber,
Representative of the |
||
|
Department: |
|
||
|
Phone: |
320-282-7113 Maureen Graber
Cell |
||
|
E-mail: |
|
||
|
*Indicates a REQUIRED field. Failure to complete any
required field will result in rejection of the application due to
incompleteness. |
|||
BMP Summary Sheet |
|||
|
MS4 Name: |
|
||
|
Minimum Control Measure: |
3-ILLICIT DISCHARGE
DETECTION AND ELIMINATION |
||
|
Unique BMP Identification Number: |
3c-1 |
||
|
*BMP Title: |
Illicit Discharge Detection
and Elimination Plan |
||
|
*BMP Description: |
|||
|
Township will review
explore hiring a professional inspection and consulting company provide
oversight of its drainage ways. Township will require all
NPDES permitted sites to submit their SWPPP to the township for review of
potential impact on township drainage ways and waters |
|||
|
Location(s) in SWPPP of
detailed information relating to this BMP: |
|||
|
|
|||
|
*Measurable Goals: |
|||
|
Review inspection records
and track number of violations annually Review inspection records
of compliance to site SWPPP annually |
|||
|
*Timeline/Implementation Schedule: |
|||
|
Make hiring of an
Inspection / consulting company decision by June 2007 SWPPP review procedure in
place by June 2008 |
|||
|
Specific Components and Notes: |
|||
|
|
|||
|
*Responsible Party for this BMP: |
|||
|
Name: |
Maureen Graber,
Representative of the |
||
|
Department: |
|
||
|
Phone: |
320-282-7113 Maureen Graber
Cell |
||
|
E-mail: |
|
||
|
*Indicates a REQUIRED field. Failure to complete any
required field will result in rejection of the application due to
incompleteness. |
|||
BMP Summary Sheet |
|||
|
MS4 Name: |
|
||
|
Minimum Control Measure: |
3-ILLICIT DISCHARGE
DETECTION AND ELIMINATION |
||
|
Unique BMP Identification Number: |
3d-1 |
||
|
*BMP Title: |
Public and Employee Illicit
Discharge Information Program |
||
|
*BMP Description: |
|||
|
The public will be informed
through information posted in the town hall and postings on the town
website. The township will establish
a channel for reporting violations by the public and employees. The township will conduct bi-annual
stormwater seminars. |
|||
|
Location(s) in SWPPP of
detailed information relating to this BMP: |
|||
|
|
|||
|
*Measurable Goals: |
|||
|
The number of Public
complaints will be tracked. The number of complaints
from the MPCA will also be tracked. |
|||
|
*Timeline/Implementation Schedule: |
|||
|
Seminar to start in 2007 Tracking 2008 Report posting 2008 |
|||
|
Specific Components and Notes: |
|||
|
|
|||
|
*Responsible Party for this BMP: |
|||
|
Name: |
Maureen Graber,
Representative of the |
||
|
Department: |
|
||
|
Phone: |
320-282-7113 Maureen Graber
Cell |
||
|
E-mail: |
|
||
|
*Indicates a REQUIRED field. Failure to complete any
required field will result in rejection of the application due to
incompleteness. |
|||
BMP Summary Sheet |
|||
|
MS4 Name: |
|
||
|
Minimum Control Measure: |
3-ILLICIT DISCHARGE
DETECTION AND ELIMINATION |
||
|
Unique BMP Identification Number: |
3e-1 |
||
|
*BMP Title: |
Identification of Non
Stormwater Discharges and Flows |
||
|
*BMP Description: |
|||
|
Water line flushing,
landscape irrigation, diverted stream flows, rising ground waters,
uncontaminated ground water infiltration, uncontaminated pumped ground water,
discharges from potable water sources, foundation drains, air conditioning
condensation, irrigation water, springs, water from crawl space pumps,
footing drains, lawn watering, individual residential car washing, flows from
riparian habitats and wetlands, dechlorinated swimming pool discharges,
street wash water, and discharges or flows from fire fighting activities. For any non-stormwater
discharges or flows which the Township finds to be a significant contributor
of pollutants to the MS4, the Township will develop an action plan to
evaluate and address the impact the discharge is having on stormwater
quality. Note: There will be a
number of multi-unit private sewage treatment systems that are regulated
under non stormwater permits. |
|||
|
Location(s) in SWPPP of
detailed information relating to this BMP: |
|||
|
|
|||
|
*Measurable Goals: |
|||
|
1) Develop a process to investigate and evaluate the potential for the non-stormwater discharges identified in permit Part V.G.3.e (see above) to be significant contributors of pollutants to our MS4. 2) Conduct investigation and evaluation of non-stormwater discharges and flows. 3) For those non-stormwater discharges or flows identified as significant contributors of pollutants to our MS4, develop an action plan to evaluate and address the impact the discharge is having on stormwater quality. 4) Implement the action plan for significant
non-stormwater discharges and flows. |
|||
|
*Timeline/Implementation Schedule: |
|||
|
Calendar Year 2008-Develop
process to investigate and evaluate non-stormwater discharges and flows.
Conduct investigation and evaluation of non-stormwater discharges and flows
and develop action plans for those which are identified as being significant
contributors of pollutants to our MS4. Calendar Year 2009-Implement
the action plans for significant non-stormwater discharges and flows. Calendar Year 2010 and
beyond-Continue with action plan above. Evaluate the implementation phase and
make adjustments as necessary. |
|||
|
Specific Components and Notes: |
|||
|
Review of non stormwater
permit compliance |
|||
|
*Responsible Party for this BMP: |
|||
|
Name: |
Maureen Graber,
Representative of the |
||
|
Department: |
|
||
|
Phone: |
320-282-7113 Maureen Graber
Cell |
||
|
E-mail: |
|
||
Minimum Control Measure 4: CONSTRUCTION SITE STORMWATER RUNOFF CONTROL
|
Key to
Unique BMP ID Numbers |
Required
BMP Title |
Permit
Reference |
|
4a-1 |
Ordinance or other
Regulatory Mechanism |
V.G.4.a |
|
4b-1 |
Construction Site Implementation
of Erosion and Sediment Control BMPs |
V.G.4.b |
|
4c-1 |
Waste Controls for
Construction Site Operators |
V.G.4.c |
|
4d-1 |
Procedure for Site Plan
Review |
V.G.4.d |
|
4e-1 |
Establishment of Procedures
for the Receipt and Consideration of Reports of Stormwater Noncompliance |
V.G.4.e |
|
4f-1 |
Establishment of Procedures
for Site Inspections and Enforcement |
V.G.4.f |
|
|
Additional BMP Summary
Sheet (Copy as Necessary) |
|
BMP Summary Sheet |
|||
|
MS4 Name: |
|
||
|
Minimum Control Measure: |
4-CONSTRUCTION SITE
STORMWATER RUNOFF CONTROL |
||
|
Unique BMP Identification Number: |
4a-1 |
||
|
*BMP Title: |
Ordinance or other
Regulatory Mechanism |
||
|
*BMP Description: |
|||
|
The General Permit
requirements include the following: Requirements for Site Plan
submittal by site operators to the MS4 for review and approval. Requirements and design
standards for temporary erosion and sediment controls during construction
activities Requirements for record
keeping of rainfall amounts and regular inspections by site operators. Requirements and criteria for
dewatering and basin draining waste controls and BMP maintenance. Requirements and design
standards for permanent erosion and sediment controls The ordinance will outline
sanctions to ensure compliance which include an enforcement component. Compliance tools will be developed as the ordinance
is developed. . |
|||
|
Location(s) in SWPPP of
detailed information relating to this BMP: |
|||
|
|
|||
|
*Measurable Goals: |
|||
|
Review partner community
ordinance Establish chain of
responsibility for administration of ordinance Establish approval process of
items regulated by ordinance Develop Township ordinance
and implement within 6 months after coverage under the NPDES General Permit. Develop Contract with
Inspection consultant March 2007 Hire consulting company
June 1 Review contract on yearly
basis for effectiveness based on pre-determined criteria |
|||
|
*Timeline/Implementation Schedule: |
|||
|
2007 Review partner
community ordinances 2007 Establish chain or
responsibility and approval process of items regulated by ordinance. 2007 into 2008 Develop and
implement the ordinance. |
|||
|
*Responsible Party for this BMP: |
|||
|
Name: |
Maureen Graber,
Representative of the |
||
|
Phone: |
320-282-7113 Maureen Graber
Cell |
||
|
E-mail: |
|
||
|
*Indicates a REQUIRED field. Failure to complete any
required field will result in rejection of the application due to
incompleteness. |
|||
BMP Summary Sheet |
|||
|
MS4 Name: |
|
||
|
Minimum Control Measure: |
4-CONSTRUCTION SITE
STORMWATER RUNOFF CONTROL |
||
|
Unique BMP Identification Number: |
4b-1 |
||
|
*BMP Title: |
Construction Site Implementation
of Erosion and Sediment Control BMPs |
||
|
*BMP Description: |
|||
|
Township will review all
Stormwater plans (SWPPP) and the installation of the BMPs before issuing a
building permits. Review all construction
site documentations to verify that appropriate BMPs or combinations of BMPs
are utilized. All excavation sites will
be required to have an ESC certified person or firm overseeing the sites
BMPs. |
|||
|
Location(s) in SWPPP of
detailed information relating to this BMP: |
|||
|
|
|||
|
*Measurable Goals: |
|||
|
Review each NPDES permit
and site SWPPP currently within township. Review permitting procedure
at public meeting and verify that all BMPs are in place before building
permit is issued. Review permitting procedure at public meeting
and verify that every site has a certified person or firm overseeing it. |
|||
|
*Timeline/Implementation Schedule: |
|||
|
June 1 2008 or before for
full implementation BMP installation prior to issuing building permits. June 1 2008, Documents
review will be conducted by Town Supervisor or consulting company. |
|||
|
Specific Components and Notes: |
|||
|
|
|||
|
*Responsible Party for this BMP: |
|||
|
Name: |
Maureen Graber,
Representative of the |
||
|
Department: |
|
||
|
Phone: |
320-282-7113 Maureen Graber
Cell |
||
|
E-mail: |
|
||
|
*Indicates a REQUIRED field. Failure to complete any
required field will result in rejection of the application due to
incompleteness. |
|||
BMP Summary Sheet |
|||
|
MS4 Name: |
|
||
|
Minimum Control Measure: |
4-CONSTRUCTION SITE
STORMWATER RUNOFF CONTROL |
||
|
Unique BMP Identification Number: |
4c-1 |
||
|
*BMP Title: |
Waste Controls for
Construction Site Operators |
||
|
*BMP Description: |
|||
|
Township ordinance will
address onsite waste storage BMP. The ordinance will require effective
control of solid waste i.e. Building waste dumpsters Ready Mix Concrete washout
area. and proper removal and disposal at completion of project. Hazardous waste Human waste All inspections required by
the township and/or the NPDES will note any excessive waste on site or in
dumpsters. Ordinance will require Dumpsters
filled to capacity to be covered or remove. Ordinance will require all
erosion and sediment control devices to be maintained and in working order or
to be removal and disposed of properly.
Ordinance will require all
waste concrete to be removed and disposed of at a recycler or state recognized
site. |
|||
|
Location(s) in SWPPP of
detailed information relating to this BMP: |
|||
|
|
|||
|
*Measurable Goals: |
|||
|
Establish of ordinances 2007
into 2008 Establish inspection check
list to verify compliance June 2008 Review inspection
compliance records annually |
|||
|
*Timeline/Implementation Schedule: |
|||
|
May 1 2008 Adoption of
Ordinance by Town Supervisors at Public meeting Annually Review inspection
compliance records annually at Public meeting Annually |
|||
|
Specific Components and Notes: |
|||
|
|
|||
|
*Responsible Party for this BMP: |
|||
|
Name: |
Maureen Graber,
Representative of the |
||
|
Department: |
|
||
|
Phone: |
320-282-7113 Maureen Graber
Cell |
||
|
E-mail: |
|
||
|
*Indicates a REQUIRED field. Failure to complete any
required field will result in rejection of the application due to
incompleteness. |
|||
BMP Summary Sheet |
|||
|
MS4 Name: |
|
||
|
Minimum Control Measure: |
4-CONSTRUCTION SITE
STORMWATER RUNOFF CONTROL |
||
|
Unique BMP Identification Number: |
4d-1 |
||
|
*BMP Title: |
Procedure for Site Plan
Review |
||
|
*BMP Description: |
|||
|
Develop a review process: All
excavation sites requiring an NPDES permit must be reviewed by the township
or its representative for ESC BMP utilization prior to issuing a building
permit per new ordinance that is to be drafted. |
|||
|
Location(s) in SWPPP of
detailed information relating to this BMP: |
|||
|
|
|||
|
*Measurable Goals: |
|||
|
Verification that new
ordinance addresses site review process Record number of sites with
active permits annually against building permit numbers to verify that the
review process is fully implemented Record all new sites opened
annually Record violations of
ordinance |
|||
|
*Timeline/Implementation Schedule: |
|||
|
June 2008 Review annually |
|||
|
Specific Components and Notes: |
|||
|
|
|||
|
*Responsible Party for this BMP: |
|||
|
Name: |
Maureen Graber,
Representative of the |
||
|
Department: |
|
||
|
Phone: |
320-282-7113 Maureen Graber
Cell |
||
|
E-mail: |
|
||
|
*Indicates a REQUIRED field. Failure to complete any
required field will result in rejection of the application due to
incompleteness. |
|||
BMP Summary Sheet |
|||
|
MS4 Name: |
|
||
|
Minimum Control Measure: |
4-CONSTRUCTION SITE
STORMWATER RUNOFF CONTROL |
||
|
Unique BMP Identification Number: |
4e-1 |
||
|
*BMP Title: |
Establishment of Procedures
for the Receipt and Consideration of Reports of Stormwater Noncompliance |
||
|
*BMP Description: |
|||
|
The township will establish
a formal complaint response program to address construction site stormwater
run off complaints and to support the illicit discharge detection program. The township will respond to calls
regarding construction site stormwater related concerns. Residents of the township will be able to
use the call line to report illicit discharges and report construction site
erosion or sedimentation concerns. The township will review
annually all record keeping that was established VIA township SWPPP items 4C1
& 4D1. |
|||
|
Location(s) in SWPPP of
detailed information relating to this BMP: |
|||
|
|
|||
|
*Measurable Goals: |
|||
|
1.) Create documented
process. 2.) Setup call line and other
appropriate notification measures 3.) Track number of calls 4.) Track number of
inspection s and follow up actions initiated from calls or complaint
received. |
|||
|
*Timeline/Implementation Schedule: |
|||
|
June 2008 - Documented
process, Call line setup - start tracking number of call June 2009 - Annual review of BMP effectiveness |
|||
|
Specific Components and Notes: |
|||
|
|
|||
|
*Responsible Party for this BMP: |
|||
|
Name: |
Maureen Graber,
Representative of the |
||
|
Department: |
|
||
|
Phone: |
320-282-7113 Maureen Graber
Cell |
||
|
E-mail: |
|
||
|
*Indicates a REQUIRED field. Failure to complete any
required field will result in rejection of the application due to
incompleteness. |
|||
BMP Summary Sheet |
|||
|
MS4 Name: |
|
||
|
Minimum Control Measure: |
4-CONSTRUCTION SITE
STORMWATER RUNOFF CONTROL |
||
|
Unique BMP Identification Number: |
4f-1 |
||
|
*BMP Title: |
Establishment of Procedures
for Site Inspections and Enforcement |
||
|
*BMP Description: |
|||
|
Watab has agreed a hire
Inspection and Consulting firm to provide on-going inspection of all construction
sites within the township. Notification and follow up
procedures will be developed. Procedures of establishing
fines or work stoppages will be adopted. |
|||
|
Location(s) in SWPPP of
detailed information relating to this BMP: |
|||
|
|
|||
|
*Measurable Goals: |
|||
|
Establish of ordinances May
2008 Develop Contract with
Inspection consultant July 2007 Adoption of Ordinance by
Town Supervisors at Public meeting Hire consulting company
June 1 Review contract on yearly
basis for effectiveness based on pre-determined criteria |
|||
|
*Timeline/Implementation Schedule: |
|||
|
2008 June 1, establish site
inspection procedure 2008 June 1, establish
reporting procedure 2008 June 1, limited
enforcement (test run) inspection and remediation process 2008 June 1, run program
with Letters of warning only 2008 Sept1, authorize work
stoppages for continued non compliance |
|||
|
Specific Components and Notes: |
|||
|
|
|||
|
*Responsible Party for this BMP: |
|||
|
Name: |
Maureen Graber,
Representative of the |
||
|
Department: |
|
||
|
Phone: |
320-282-7113 Maureen Graber
Cell |
||
|
E-mail: |
|
||
|
*Indicates a REQUIRED field. Failure to complete any
required field will result in rejection of the application due to
incompleteness. |
|||
BMP
Summary Sheet Instructions
Minimum Control Measure 5: POST-CONSTRUCTION STORMWATER MANAGEMENT IN NEW
DEVELOPMENT AND REDEVELOPMENT
|
Key to
Unique BMP ID Numbers |
Required
BMP Title |
Permit
Reference |
|
5a-1 |
Development and
Implementation of Structural and/or Non-structural BMPs |
V.G.5.a |
|
5b-1 |
Regulatory Mechanism to Address
Post Construction Runoff from New Development and Redevelopment |
V.G.5.b |
|
5c-1 |
Long-term Operation and
Maintenance of BMPs |
V.G.5.c |
|
|
Additional BMP Summary
Sheet (Copy as Necessary) |
|
BMP Summary Sheet |
|||
|
MS4 Name: |
|
||
|
Minimum Control Measure: |
5-POST-CONSTRUCTION
STORMWATER MANAGEMENT IN NEW DEVELOPMENT AND REDEVELOPMENT |
||
|
Unique BMP Identification Number: |
5a-1 |
||
|
*BMP Title: |
Development and
Implementation of Structural and/or Non-structural BMPs |
||
|
*BMP Description: |
|||
|
. |
|||
|
Location(s) in SWPPP of
detailed information relating to this BMP: |
|||
|
|
|||
|
*Measurable Goals: |
|||
|
1) Review wet detention
pond design standards annually along with investigating new post-construction
BMPs. 2) Track the number of new
wet detention ponds created per calendar year. 3) Determine the acres of
new impervious surface that has been put in place each calendar year |
|||
|
*Timeline/Implementation Schedule: |
|||
|
Ongoing & annual review |
|||
|
Specific Components and Notes: |
|||
|
|
|||
|
*Responsible Party for this BMP: |
|||
|
Name: |
Maureen Graber,
Representative of the |
||
|
Department: |
|
||
|
Phone: |
320-282-7113 Maureen Graber
Cell |
||
|
E-mail: |
|
||
|
*Indicates a REQUIRED field. Failure to complete any
required field will result in rejection of the application due to
incompleteness. |
|||
BMP Summary Sheet |
|||
|
MS4 Name: |
|
||
|
Minimum Control Measure: |
5-POST-CONSTRUCTION
STORMWATER MANAGEMENT IN NEW DEVELOPMENT AND REDEVELOPMENT |
||
|
Unique BMP Identification Number: |
5b-1 |
||
|
*BMP Title: |
Regulatory Mechanism to
Address Post Construction Runoff from New Development and Redevelopment |
||
|
*BMP Description: |
|||
|
Create Ordinance and
processes to support procedures listed in 5c1 (5c1. All land disturbance areas will be
inspected annually for 5 years after filing of the MPCA Notice of termination
to verify that the BMPs have permanently stabilized the site and that the
water quality is protected. The
Township will provide inspection criteria or form. Developer will have to
provide funds or mechanism for the required inspections. i.e. Pond
Maintenance Inspection Check List) |
|||
|
Location(s) in SWPPP of
detailed information relating to this BMP: |
|||
|
|
|||
|
*Measurable Goals: |
|||
|
Create ordinance with
public input and PCA recommendation |
|||
|
*Timeline/Implementation Schedule: |
|||
|
2008 June |
|||
|
Specific Components and Notes: |
|||
|
|
|||
|
*Responsible Party for this BMP: |
|||
|
Name: |
Maureen Graber,
Representative of the |
||
|
Department: |
|
||
|
Phone: |
320-282-7113 Maureen Graber
Cell |
||
|
E-mail: |
|
||
|
*Indicates a REQUIRED field. Failure to complete any
required field will result in rejection of the application due to
incompleteness. |
|||
BMP Summary Sheet |
|||
|
MS4 Name: |
|
||
|
Minimum Control Measure: |
5-POST-CONSTRUCTION
STORMWATER MANAGEMENT IN NEW DEVELOPMENT AND REDEVELOPMENT |
||
|
Unique BMP Identification Number: |
5c-1 |
||
|
*BMP Title: |
Long-term Operation and
Maintenance of BMPs |
||
|
*BMP Description: |
|||
|
All land disturbance areas
will be inspected annually for 5 years after filing of the MPCA Notice of
termination to verify that the BMPs have permanently stabilized the site and
that the water quality is protected.
The Township will provide inspection criteria or form. Developer will
have to provide funds or mechanism for the required inspections. i.e. Pond Maintenance Inspection Check List. |
|||
|
Location(s) in SWPPP of
detailed information relating to this BMP: |
|||
|
|
|||
|
*Measurable Goals: |
|||
|
1.) Review of current BMPs
effectiveness 2.) Set replacement or
enhancement timeline of ineffective BMPs. 3.) Create ordinance to
accomplish objective 4.) develop standard
inspection documentation and review process |
|||
|
*Timeline/Implementation Schedule: |
|||
|
Phase in approach as more
information is available |
|||
|
Specific Components and Notes: |
|||
|
|
|||
|
*Responsible Party for this BMP: |
|||
|
Name: |
Maureen Graber,
Representative of the |
||
|
Department: |
|
||
|
Phone: |
320-282-7113 Maureen Graber
Cell |
||
|
E-mail: |
|
||
|
*Indicates a REQUIRED field. Failure to complete any
required field will result in rejection of the application due to
incompleteness. |
|||
BMP
Summary Sheet Instructions
Minimum
Control Measure 6: POLLUTION
PREVENTION/GOOD HOUSEKEEPING
|
Key to
Unique BMP ID Numbers |
Required
BMP Title |
Permit
Reference |
|
6a-1 |
Municipal Operations and
Maintenance Program |
V.G.6.a |
|
6a-2 |
Street Sweeping** |
|
|
6b-2 |
Annual Inspection of All
Structural Pollution Control Devices |
V.G.6.b.2 |
|
6b-3 |
Inspection of a Minimum of
20 percent of the MS4 Outfalls, |
V.G.6.b.3 |
|
6b-4 |
Annual Inspection of All
Exposed Stockpile, Storage and Material Handling Areas |
V.G.6.b.4 |
|
6b-5 |
Inspection Follow-up
Including the Determination of Whether
Repair, Replacement, or Maintenance Measures are Necessary and the
Implementation of the Corrective Measures |
V.G.6.b.5 |
|
6b-6 |
Record Reporting and
Retention of all Inspections and Responses to the Inspections |
V.G.6.b.6 |
|
6b-7 |
Evaluation of Inspection
Frequency |
V.G.6.b.7 |
|
|
Additional BMP Summary
Sheet (Copy as Necessary) |
|
BMP Summary Sheet |
|||
|
MS4 Name: |
|
||
|
Minimum Control Measure: |
6-POLLUTION
PREVENTION/GOOD HOUSEKEEPING |
||
|
Unique BMP Identification Number: |
6a-1 |
||
|
*BMP Title: |
Municipal Operations and
Maintenance Program |
||
|
*BMP Description: |
|||
|
The Township has very
little day to day maintenance of public infrastructure and properties, as
such only emergency repair and maintenance are necessary. Storm water conveyances
systems will be kept in good working order and free of trash and debris. |
|||
|
Location(s) in SWPPP of
detailed information relating to this BMP: |
|||
|
|
|||
|
*Measurable Goals: |
|||
|
1.) Review of annual
inspections details for problems stormwater conveyances to assess
effectiveness of township maintenance program. 2.) Annually, Township will
have a certified individual inspect 100% of its stormwater conveyance
outfalls to receiving waters. Township
will also inspect for illicit discharges and maintenance issues. |
|||
|
*Timeline/Implementation Schedule: |
|||
|
Annually and ongoing |
|||
|
Specific Components and Notes: |
|||
|
|
|||
|
*Responsible Party for this BMP: |
|||
|
Name: |
Maureen Graber,
Representative of the |
||
|
Department: |
|
||
|
Phone: |
320-282-7113 Maureen Graber
Cell |
||
|
E-mail: |
|
||
|
*Indicates a REQUIRED field. Failure to complete any
required field will result in rejection of the application due to
incompleteness. |
|||
BMP Summary Sheet |
|||
|
MS4 Name: |
|
||
|
Minimum Control Measure: |
6-POLLUTION
PREVENTION/GOOD HOUSEKEEPING |
||
|
Unique BMP Identification Number: |
6a-2 |
||
|
*BMP Title: |
Street Sweeping** |
||
|
*BMP Description: |
|||
|
|
|||
|
Location(s) in SWPPP of
detailed information relating to this BMP: |
|||
|
|
|||
|
*Measurable Goals: |
|||
|
Review site SWPPP for
street sweeping BMP Review inspection record for
frequency of soil on streets. Review types of equipment used
and condition when sweeping is conducted |
|||
|
*Timeline/Implementation Schedule: |
|||
|
2008 Review of all new
NPDES permit SWPPPs within 2008 Monthly review of BMP
effectiveness all new NPDES permit sites within |
|||
|
Specific Components and Notes: |
|||
|
|
|||
|
*Responsible Party for this BMP: |
|||
|
Name: |
Maureen Graber, Representative
of the |
||
|
Department: |
|
||
|
Phone: |
320-282-7113 Maureen Graber
Cell |
||
|
E-mail: |
|
||
|
*Indicates a REQUIRED field. Failure to complete any
required field will result in rejection of the application due to
incompleteness. |
|||
BMP Summary Sheet |
|||
|
MS4 Name: |
|
||
|
Minimum Control Measure: |
6-POLLUTION
PREVENTION/GOOD HOUSEKEEPING |
||
|
Unique BMP Identification Number: |
6b-2 |
||
|
*BMP Title: |
Annual Inspection of All
Structural Pollution Control Devices |
||
|
*BMP Description: |
|||
|
|
|||
|
Location(s) in SWPPP of
detailed information relating to this BMP: |
|||
|
|
|||
|
*Measurable Goals: |
|||
|
1.) Record all structural
pollution control device s with the township boundaries. 2.) Inspect all structural
pollution control devices and generate report on effectiveness. |
|||
|
*Timeline/Implementation Schedule: |
|||
|
June 2008 Annually |
|||
|
Specific Components and Notes: |
|||
|
|
|||
|
*Responsible Party for this BMP: |
|||
|
Name: |
Maureen Graber,
Representative of the |
||
|
Department: |
|
||
|
Phone: |
320-282-7113 Maureen Graber
Cell |
||
|
E-mail: |
|
||
|
*Indicates a REQUIRED field. Failure to complete any
required field will result in rejection of the application due to incompleteness. |
|||
BMP Summary Sheet |
|||
|
MS4 Name: |
|
||
|
Minimum Control Measure: |
6-POLLUTION
PREVENTION/GOOD HOUSEKEEPING |
||
|
Unique BMP Identification Number: |
6b-3 |
||
|
*BMP Title: |
Inspection of a Minimum of
20 percent of the MS4 Outfalls, |
||
|
*BMP Description: |
|||
|
The township will inspect
system components to look for sedimentation buildup and debris build up that
may hamper the efficiency of the systems.
The township will record new and existing outfalls, retention ponds,
and infiltration ponds. |
|||
|
Location(s) in SWPPP of
detailed information relating to this BMP: |
|||
|
|
|||
|
*Measurable Goals: |
|||
|
1.) Inspect at least 50% of
system components annually 2.) Record and track
progress on objective 6b-3 3.) Record and Track
township remediation of problematic areas |
|||
|
*Timeline/Implementation Schedule: |
|||
|
Start June 2008 Annually |
|||
|
Specific Components and Notes: |
|||
|
|
|||
|
*Responsible Party for this BMP: |
|||
|
Name: |
Maureen Graber,
Representative of the |
||
|
Department: |
|
||
|
Phone: |
320-282-7113 Maureen Graber
Cell |
||
|
E-mail: |
|
||
|
*Indicates a REQUIRED field. Failure to complete any
required field will result in rejection of the application due to
incompleteness. |
|||
BMP Summary Sheet |
|||
|
MS4 Name: |
|
||
|
Minimum Control Measure: |
6-POLLUTION
PREVENTION/GOOD HOUSEKEEPING |
||
|
Unique BMP Identification Number: |
6b-4 |
||
|
*BMP Title: |
Annual Inspection of All
Exposed Stockpile, Storage and Material Handling Areas |
||
|
*BMP Description: |
|||
|
Include stock pile
inspection into on-going inspection procedure and set guide line to coincide
with NPDES permit stabilization requirements. |
|||
|
Location(s) in SWPPP of
detailed information relating to this BMP: |
|||
|
|
|||
|
*Measurable Goals: |
|||
|
Establish stock piles as
part of inspection process initiated in 4f-1 |
|||
|
*Timeline/Implementation Schedule: |
|||
|
2008 |
|||
|
Specific Components and Notes: |
|||
|
|
|||
|
*Responsible Party for this BMP: |
|||
|
Name: |
Maureen Graber,
Representative of the |
||
|
Department: |
|
||
|
Phone: |
320-282-7113 Maureen Graber
Cell |
||
|
E-mail: |
|
||
|
*Indicates a REQUIRED field. Failure to complete any
required field will result in rejection of the application due to
incompleteness. |
|||
BMP Summary Sheet |
|||
|
MS4 Name: |
|
||
|
Minimum Control Measure: |
6-POLLUTION
PREVENTION/GOOD HOUSEKEEPING |
||
|
Unique BMP Identification Number: |
6b-5 |
||
|
*BMP Title: |
Inspection Follow-up
Including the Determination of Whether
Repair, Replacement, or Maintenance Measures are Necessary and the
Implementation of the Corrective Measures |
||
|
*BMP Description: |
|||
|
Remediation follow up
procedure with corrective action measures will be put in place via 4f-1
documented procedure. |
|||
|
Location(s) in SWPPP of
detailed information relating to this BMP: |
|||
|
|
|||
|
*Measurable Goals: |
|||
|
1.) 2008 Inspection
procedure includes remediation/follow up procedure 2.) Incorporate into 4f1
documents |
|||
|
*Timeline/Implementation Schedule: |
|||
|
2007 |
|||
|
Specific Components and Notes: |
|||
|
|
|||
|
*Responsible Party for this BMP: |
|||
|
Name: |
Maureen Graber,
Representative of the |
||
|
Department: |
|
||
|
Phone: |
320-282-7113 Maureen Graber
Cell |
||
|
E-mail: |
|
||
|
*Indicates a REQUIRED field. Failure to complete any
required field will result in rejection of the application due to
incompleteness. |
|||
BMP Summary Sheet |
|||
|
MS4 Name: |
|
||
|
Minimum Control Measure: |
6-POLLUTION
PREVENTION/GOOD HOUSEKEEPING |
||
|
Unique BMP Identification Number: |
6b-6 |
||
|
*BMP Title: |
Record Reporting and
Retention of All Inspections and Responses to the Inspections |
||
|
*BMP Description: |
|||
|
Watab township record
keeping will coincide with NPDES record retention requirements - minimum of
three years. Response requirement will
coincide with watershed district requirement of seven days (7) except in
emergency situations where significant environmental harm is possible or immanent.
Record retention and response will be incorporate into 4f1 documentation. |
|||
|
Location(s) in SWPPP of
detailed information relating to this BMP: |
|||
|
|
|||
|
*Measurable Goals: |
|||
|
1.) Incorporate response
timelines into all township pollution control inspection and notification
documents 2.) Maintain up-to-date
records |
|||
|
*Timeline/Implementation Schedule: |
|||
|
2007/on going |
|||
|
Specific Components and Notes: |
|||
|
|
|||
|
*Responsible Party for this BMP: |
|||
|
Name: |
Maureen Graber,
Representative of the |
||
|
Department: |
|
||
|
Phone: |
320-282-7113 Maureen Graber
Cell |
||
|
E-mail: |
|
||
|
*Indicates a REQUIRED field. Failure to complete any
required field will result in rejection of the application due to
incompleteness. |
|||
BMP Summary Sheet |
|||
|
MS4 Name: |
|
||
|
Minimum Control Measure: |
6-POLLUTION
PREVENTION/GOOD HOUSEKEEPING |
||
|
Unique BMP Identification Number: |
6b-7 |
||
|
*BMP Title: |
Evaluation of Inspection
Frequency |
||
|
*BMP Description: |
|||
|
Watab township will
evaluate sites within its jurisdiction and set inspection frequency to
accomplish its goals of reducing pollution and improving general house
keeping. The inspection frequency will
be evaluated annually. |
|||
|
Location(s) in SWPPP of
detailed information relating to this BMP: |
|||
|
|
|||
|
*Measurable Goals: |
|||
|
1.) Prioritize sites by
most problematic to least problematic 2.) Establish frequency of
inspection 3.) Review inspection results
and adjust inspection frequency according to re-accruing problems |
|||
|
*Timeline/Implementation Schedule: |
|||
|
2008 Annually adjustment to
inspection frequency |
|||
|
Specific Components and Notes: |
|||
|
|
|||
|
*Responsible Party for this BMP: |
|||
|
Name: |
Maureen Graber,
Representative of the |
||
|
Department: |
|
||
|
Phone: |
320-282-7113 Maureen Graber
Cell |
||
|
E-mail: |
|
||
|
*Indicates a REQUIRED field. Failure to complete any
required field will result in rejection of the application due to incompleteness. |
|||
BMP Summary Sheet |
|||
|
MS4 Name: |
|
||
|
Permit Condition: |
IV.D Section 303(d)
listings |
||
|
Unique BMP Identification Number: |
7a-1 |
||
|
BMP Title: |
Impaired Waters Review
Process |
||
|
BMP Description: |
|||
|
In this review, 1.
Identify the
impaired waters that may be impacted by the MS4’s stormwater discharge. 2.
Use a
combination of maps and field surveys to identify all potential stormwater
discharges to impaired waters 3.
Delineate the
watershed area(s) that contribute to the above discharge(s), if possible. 4.
Evaluate the
hydrology, land use and other characteristics of the watershed area(s) that
may impact the impaired water as a result of a stormwater discharge from our
MS4 Based on the review above,
we will determine if any changes to the existing MS4 or BMPs are needed to
minimize the impact of discharges from our MS4 to the impaired water(s). If
such modifications are necessary, |
|||
|
Measurable Goals: |
|||
|
1. Establish a baseline of information– determine what
processes are in place and what has already been accomplished that will help
meet these permit conditions 2. Prepare a written inventory of all impaired waters
within the jurisdictional boundaries of the MS4, as well as those outside
these boundaries likely to have an impact as a result of receiving stormwater
discharge from the MS4; compile as much detail about the stormwater
discharges they receive from the MS4 as is available 3. Prepare a map that includes all impaired waters that
the MS4 discharge may impact, all MS4 discharge points that may impact these
water(s), and delineated watershed(s) that may contribute to the impairment 4. Complete for records a written overview of the
conclusions reached through this review, including the decision making
process used to determine what SWPPP revisions may be needed 5. Prepare a projected schedule and timeline to
incorporate any necessary changes into the SWPPP |
|||
|
Timeline/Implementation Schedule: |
|||
|
Calendar Year 2007:
Identify what steps, if any, have already been taken by Calendar Year 2008: Identify
impaired waters receiving likely impacts from stormwater discharges from MS4
and locate discharges Calendar Year 2008:
Delineate watersheds contributing runoff to impaired waters Calendar Year 2008: Develop
a Map of discharges Calendar Year 2008: Complete
an Evaluation of hydrology, land use, etc. Calendar Year 2009: Include
in Annual Report to MPCA the overview of the impaired waters review and any
changes to the SWPPP that have been deemed necessary through this review
process. |
|||
|
Specific Components and Notes: |
|||
|
This process is to be
reassessed annually over the course of the permit cycle. As new 303(d) lists
with additional impaired waters listed are published in the future, When an USEPA approved TMDL
is finalized, |
|||
|
Responsible Party for this BMP: |
|||
|
Name: |
Maureen Graber,
Representative of the |
||
|
Department: |
|
||
|
Phone: |
320-282-7113 Maureen Graber
Cell |
||
|
E-mail: |
|
||